Element5

Industrial

This new, 125,000 sq. ft. cross laminated timber (CLT) production facility is comprised of a prefabricated steel frame on concrete foundations. Gray & Fick was responsible for designing the footings, foundations, and preliminary design of office spaces, while the metal building above was designed by the prefabricated steel building fabricator.



This production facility will be the first CLT production facility in Ontario, greatly improving the availability of this growing material in the Ontario market and directly creating 50 jobs in the St. Thomas area as well as approximately 240 jobs in the manufacturing, transportation, and logging sectors. The Gray & Fick team was able to accommodate numerous pieces of large industrial equipment on the main slab, as well as providing efficient foundations for the structure.

Architect:

Philip Agar Architect

Contractor: 

Sierra Construction

Completion: 

2020

Approximate Value: 

1/3

Need more details? Contact us

We are here to assist. Contact us by phone, email or via our Social Media channels.

© 2020 Gray & Fick Ltd.

  • Black Facebook Icon
  • Black LinkedIn Icon
  • Black Instagram Icon

309 Consortium Court

London, ON, N6E 2S8